Heritage Hall Bioswale

Quick facts:

When Gem Lake and White Bear Township built Heritage Hall in 2007, this 3,500 square foot raingarden was installed to infiltrate and treat stormwater from the part of the building and its parking lot.

Funding:

The raingarden was partially funded by a VLAWMO cost share, and the rest was covered by the building cost of the Hall.

Reason for project:

The raingarden was installed to capture stormwater from the newly-constructed building, while planting native species. The raingarden also helps towards White Bear Township’s MS4 permitting goals.

Construction:

The basin was constructed along with the building in 2007. 

Results:

After weeding and replanting in 2010, the basin functions to infiltrate stormwater and capture and treat nutrients and pollutants.

Search projects

Whitaker Pond Biochar Stormwater Filter

A surface water filter targeting pollutants that enter Lambert Creek during high water levels.

Goodwill Development & Wetland Mitigation

This commercial development took place on a property with a historically degraded wetland, and includes a proactive stormwater plan that benefits the watershed.

Lambert Lake Pond and Meander

An effort to restore floodplain storage, sediment dispersal, and treat high E. coli levels.

Lambert Creek/Ditch 14 Maintenance

Ditch 14/Lambert Creek maintenance activities.

Ditch 14/Lambert Creek Engineering: Historic & Current Efforts

A description and supporting documents for the historical conditions of Lambert Creek/Ditch 14 and its branch ditches

Lambert Creek E. coli Source Study

RSS Icon