Lambert Creek E. coli Source Study

Lambert Creek is currently on the state impaired list for high levels of E. coli. The creek was monitored for E. coli at 5 sub-watershed sampling locations weekly during the summer from 2008-2012. The Vadnais Lake Area WMO is currently working with a consultant to do target monitoring and molecular sourcing (E. coli host: human, animal or avian) at these locations to both determine the source of the E. coli impairment and also determine proper best management practices (BMP's) to reduce the E. coli impairment. VLAWMO began monitoring two sub-watershed locations this summer on Lambert Creek (Oakmede and Cty Rd. F) to understand where the Lambert Creek E. coli impairment is coming from. The target monitoring will give us better idea where the hot spots for E. coli are at each location on the creek and the molecular sourcing will tell us the origin of the E. coli.

This year E. coli culture samples were taken 4 days a week for three to four weeks. We have to get samples during dry conditions so at least 72 hrs from a significant rainfall for a minimum of 12 samples at each sample site in order to get a significant data set to run the statistics on the results. Once these samples have been analyzed we will then begin the molecular sampling at each of these locations.

For the molecular sampling we will be taking 2 molecular samples twice weekly for two to three weeks at Oakmede and 3 molecular samples twice weekly for two to three weeks at Cty Rd. F. These samples will also be taken during dry conditions.

At the completion of this project we hope to have an understanding of exactly where the E. coli is coming from at these locations on the creek and also area's to incorporate BMP's to reduce the ecoli impairment to below state standards. The 3 other sub-watersheds on the creek (Whitaker, Goose and Koehler) will be addressed next summer.

What have we learned? 

camera-gray-textured.png
Project Image Gallery

Search projects

Birch Lake Aquatic Invasive Species Efforts

Efforts to remove Eurasian Watermilfoil and Curly-leaf Pondweed

4th and Otter Woodland Restoration

A woodland restoration at a key location adjacent to Birch Lake in White Bear Lake.

Birch Lake Sand-Iron Stormwater Filter

An iron-enhanced sand filter at the intersection of 4th St. and Otter Lake Road. The filter helps reduce nutrients entering Birch Lake with stormwater runoff.

Birch Lake North Shoreline Restoration

A 150 foot stretch of lakeshore on Birch Lake, in White Bear Lake was improved in the summer of 2010. In 2011-2012, an additional 700 feet of shoreline was restored on either side of the original planting area.

Charley Lake Channel Restoration

The channel between Charley Lake and Pleasant Lake in North Oaks was showing signs of serious erosion.

Deep Lake Channel Restoration

This project will restore approximately 125 feet of shoreline in the Deep Lake Channel, just before it enters Pleasant Lake. The project will be completed in Fall 2015.