Polar Chevrolet Parking Lot

Quick Facts: 

This project is located on the southwest shoreline of East Goose Lake, just east of Highway 61 and north of County Road F.

Approximately 500 ft of East Goose lake shoreline was restored on the project site.

Five iron-enhanced sand filters were constructed as part of the project to treat stormwater runoff.

Funding:

Private project.

Reason for Project:

Site renovation, including the construction of a new building and parking lot.

Construction: 

This project constructed five iron-enhanced sand filters to treat runoff from the new building and parking lot prior to discharge into East Goose Lake. In addition, approximately 500 feet of shoreline was restored. The shoreline restoration involved removing historic fill material and planting the shoreline with native emergent plants, upland prairie plants, and trees.

Results: 

The iron-enhanced sand filters are designed to remove 62 percent of the site’s total annual phosphorus from stormwater runoff. Pretreatment structures were installed at the inlet of each iron-enhanced sand filter to capture sediment and other debris from the parking lot.

The shoreline restoration improves the overall health of the lake by stabilizing the soils and providing wildlife habitat.

camera-gray-textured.png
Project Image Gallery

Search projects

Birch Lake Aquatic Invasive Species Efforts

Efforts to remove Eurasian Watermilfoil and Curly-leaf Pondweed

4th and Otter Woodland Restoration

A woodland restoration at a key location adjacent to Birch Lake in White Bear Lake.

Birch Lake Sand-Iron Stormwater Filter

An iron-enhanced sand filter at the intersection of 4th St. and Otter Lake Road. The filter helps reduce nutrients entering Birch Lake with stormwater runoff.

Birch Lake North Shoreline Restoration

A 150 foot stretch of lakeshore on Birch Lake, in White Bear Lake was improved in the summer of 2010. In 2011-2012, an additional 700 feet of shoreline was restored on either side of the original planting area.

Charley Lake Channel Restoration

The channel between Charley Lake and Pleasant Lake in North Oaks was showing signs of serious erosion.

Deep Lake Channel Restoration

This project will restore approximately 125 feet of shoreline in the Deep Lake Channel, just before it enters Pleasant Lake. The project will be completed in Fall 2015.
RSS Icon